Services
Eleven septic services, and which one your situation calls for
Pick the page that matches where you are. Each one explains the work, the price range here, and the rules that apply.
All services
-
Cesspool replacement on Cape Cod and the South Shore
Why a cesspool is a pit and not a system, which towns fail one automatically at sale, and what the conversion costs in 2026.
Typical range: $20,000–$35,000
-
Failed Title 5 repair and upgrade on Cape Cod and the South Shore
What the report obligates you to do, how long you have, and the three ways a sale still closes with a failed system.
Typical range: $1,000–$40,000
-
Innovative/alternative (I/A) septic systems on Cape Cod
What a denitrifying system does, where the 2023 rules and town bylaws require one, the brands on MassDEP's list, and the yearly bill.
Typical range: $30,000–$40,000
-
Leach field replacement on Cape Cod and the South Shore
How a soil absorption system gives out, the two numbers that size its replacement, and why jetting does not satisfy Title 5.
Typical range: $10,000–$20,000
-
Septic design and soil evaluation on Cape Cod and the South Shore
Who digs, who watches, how the water table is set, and how a soil log becomes a stamped plan the board of health will approve.
Typical range: $2,500–$5,000
-
Septic pumping on Cape Cod and the South Shore
How often, what it costs, why the receipt matters more than you think, and the problems a pump-out will not solve.
Typical range: $350–$600
-
Septic repair on Cape Cod and the South Shore
The four component repairs that show up on Cape reports, what each costs, and the line between a repair and a replacement.
Typical range: $1,000–$5,000
-
Septic system replacement on Cape Cod and the South Shore
From the first test pit to the Certificate of Compliance, with 2026 prices and the rules that decide conventional or I/A.
Typical range: $20,000–$40,000
-
Septic tank replacement on Cape Cod and the South Shore
When the tank is the only thing wrong, what a swap costs, and why one tank still needs a permit and a Certificate of Compliance.
Typical range: $4,000–$8,000
-
Sewer connection and septic abandonment on Cape Cod and the South Shore
What happens when the pipe reaches your street: the order, the assessment, the lateral, the abandonment, and the money that helps.
Typical range: $5,000–$15,000
-
Title 5 inspections on Cape Cod and the South Shore
Who may sign the report, what gets opened and measured, how long a pass lasts, and how to schedule one without stalling a closing.
Typical range: $500–$800
Jobs that begin with an inspection result
Most requests start with a Title 5 report, and the result on the form usually names the service. A Title 5 inspection is the job when you are selling, adding bedrooms, or want to know where an older system stands; only a MassDEP-approved System Inspector may sign it, and a pass is good for two years. A conditional pass points to failed Title 5 repair and upgrade work on the one component named, which is often a septic tank replacement when the tank is metal or cracked. A fail on the leaching area means a leach field replacement if the tank is sound and a reserve area exists, or a full septic system replacement when it does not. The Title 5 guide explains the four results and the two-year clock that follows a fail.
Jobs a local rule or a map decides for you
Some work is set by the town, not the inspector. Cesspool replacement is required at sale in Wareham, Duxbury, Pembroke, Mashpee and Eastham by local rule, and in every town before a bedroom is added. Innovative/alternative septic systems come into play in the Cape’s nitrogen sensitive watersheds, under Falmouth’s new-construction rule, and on small lots where a board of health trades a smaller field for nitrogen treatment. A sewer connection with proper abandonment is the compliant answer once a pipe reaches your street in Barnstable, Chatham, Orleans, Dennis, Yarmouth, Provincetown or Marshfield. Every one of these starts with septic design and soil evaluation, the witnessed deep hole and perc test that size the system and set the groundwater separation.
Maintenance and the smaller repairs
Septic pumping every three years or so, yearly with a garbage disposal or an I/A unit, is the one job that prevents most of the others, and the receipts extend a passing report from two years to three. Septic repair covers baffles, tees, effluent filters, pumps, floats, alarms and broken lines, each of which still needs a permit and a Certificate of Compliance from the board of health.
Which town you are in changes the price, the permit office and the money available, so the service areas page and each town’s own page sit beside every service. Two programs pay for a large share of most upgrades, the state tax credit everywhere and AquiFund in Barnstable County; the replacement cost guide shows what moves the number.
The process
From your request to a site visit
-
Your request goes to one local septic company
It goes to a single septic company that works in your town and handles your kind of job. It is not sold to a list, and you will not get calls from five companies.
-
They call to set up a site visit
Expect a call, usually within one business day. The contractor asks about the house, the inspection report if you have one, and your timing, then books a visit.
-
You get a written quote and decide
After the visit you receive a written estimate with the scope and the permit plan. There is no fee and no obligation. If it is not a fit, say so and that is the end of it.
Tell us about your system
One call or form, a written quote after a site visit. Free for homeowners, no obligation.